Electrician in Tbilisi › Services › Electrician on call
Electrical wiring in Tbilisi: flats, houses, offices
A new flat, a renovation or old aluminium wires: Labex plans the circuits room by room, spreads the load properly and runs dedicated lines for the cooker, the boiler and the air conditioning.
- Complete wiring for flats, houses and offices
- Replacing old aluminium wiring with copper cable
- Dedicated circuits for cooker, boiler and air conditioning
- Running a new socket or switch point
- Splitting the circuits at the board for today's load

When does the wiring need replacing?
When the flat still has old aluminium wires; a circuit heats up or the breaker trips often; there are too few sockets and you live on extension leads; a renovation is starting and the walls will be opened anyway; or heavy new appliances are coming. A renovation is the best moment: replacing wiring after the walls are finished is far harder.
How does Labex do the wiring?
- Counting the points and appliances room by room, with you
- A circuit plan: what sits on which circuit and which breaker
- Running the cable in the wall or in trunking, at the right cross-section
- Building the board: breakers, residual current device, labels
- Testing every circuit and handover
Wiring is usually done together with a new distribution board and the earthing; for the points themselves see socket and switch installation. Old aluminium wiring is still common in Soviet-era blocks: electrician in Gldani.
What does electrical wiring from Labex include?
A new flat, a renovation or old aluminium wires: Labex plans the circuits room by room, spreads the load properly and runs dedicated lines for the cooker, the boiler and the air conditioning.
How quickly does the electrician arrive?
Labex takes emergency calls first and handles most requests in Tbilisi the same day. Average response time is 30 minutes.
Where does Labex work?
Labex works across Tbilisi, in every district, and in the areas just outside the city.
What does electrical wiring cost?
The price depends on the number of points, the floor area, the wall material and how complex the board is. Labex counts the points and circuits on site first and tells you the cost before any work starts.
Does wiring need a plan?
Yes. Before a wall is chased it has to be clear where every socket, switch and light goes and which appliance sits on which circuit. Labex draws up that plan with you and labels every circuit at the board.
Does old aluminium wiring have to be replaced?
If a run heats up, the contacts weaken or the load has grown, replacing it is the right decision. Labex measures first and then tells you whether the whole installation needs replacing or only part of it.
